  1. #51 Re: Project Hugs Version 4.0 
    Member
    Join Date
    Feb 2016
    Location
    E-town PA
    Posts
    181
    Rep Power
    16
    Thanks. Even though this thing is a bit crusty around the edges I still want to do things right. It still progressing slowly, but I should get some more time to work on it next weekend.

    Sent from my SAMSUNG-SM-G930A using Tapatalk
    Reply With Quote  
     

  2. #52 Re: Project Hugs Version 4.0 
    Member
    Join Date
    Feb 2016
    Location
    E-town PA
    Posts
    181
    Rep Power
    16
    Made some progress on the swap today. Decided to focus on that and if I need to drive it can throw a fender and bumpers back on quickly. This post and those following will be picture heavy as I really want to document the process I'm using really well for future reference.

    Auto shifter, cable, and shift interlock are all out. After drilling the 4 spot welds there is still a weld at the front of the lower portion of the shifter bracket. I just worked it back and forth until it broke, it didn't take much. This is definitely somewhere it would be nice to have the correct part from a donor 5 speed. It looks like I will need to cut the plate out at the top of the recess, meaning the bigger circle, for the shifter to clear right.




    Next the brake pedal came out and got lined up next to the XJ pedal cluster. There was a small bracket bolted to the clutch side of the XJ cluster, but more on that later. Once I had the XJ cluster marked I cut off the excess and welded on a new piece of 3/16" plate to make a new top. With some careful eyeballing with a straight edge I even nailed the top mounting hole.







    And here is that extra little bracket. It actually runs to the firewall and backs up the clutch master cylinder. Definitely a piece I will want to be using. Sadly, as I've read, the XJ cluster doesn't line up with the ZJ's existing holes. Clever Chrysler used the clutch master mounting hole to mount the TCM to the firewall, though! Looks like I'll be bolting the block off back in.


    The ZJ brake light switch does not fit the XJ cluster. However, I found an extra harness tucked up under the dash that the XJ one plugs right into. Not sure if it will work right, but I'll figure it out. Battery is disconnected right now.


    And finally a pic of the pedals installed.


    Sent from my SAMSUNG-SM-G930A using Tapatalk
    Last edited by Yjsaabman717; 08-24-2019 at 04:28 PM.
    Reply With Quote  
     

  3. #53 Re: Project Hugs Version 4.0 
    Member
    Join Date
    Feb 2016
    Location
    E-town PA
    Posts
    181
    Rep Power
    16
    Finally got to make some more progress today.

    My goal was to get the master cylinder mounting squared away today. The support plate has a stud pressed into it, so I made a small partial of the bracket out of some tin to locate the top hole. Then I made a card template of the master cylinder and marked it all out on the firewall. I pulled the pedal cluster back out to make some more room, but my cordless drill is just a hair too big to fit up in there right. My right angle drill is at work, so maybe next weekend. I do have a 1-1/2" hole saw that's going to be great for the hole for the body of the MC. You can see the overlap with the hole for the factory ZJ clutch hydraulics, I hope that doesn't cause too much issue.


    Next up was to pull the trans shifter and dry fit the trans to confirm the shifter location. Auto flex plate is now gone, and I pulled the trans cooler lines and the TV cable while I was at it. Trans fits as it should and the shifter should fall right where I thought it would.



    So back to working on the wheel openings. I did some final shaping of the flat insert panel at the rear door opening and worked on finishing up some of the welding back there.





    Sent from my SAMSUNG-SM-G930A using Tapatalk
    Last edited by Yjsaabman717; 09-08-2019 at 10:25 PM.
    Reply With Quote  
     

  4. #54 Re: Project Hugs Version 4.0 
    Member
    Join Date
    Feb 2016
    Location
    E-town PA
    Posts
    181
    Rep Power
    16
    Another weekend lacking in time. And this month is busy overall. I hope I can get this thing put together before I need it. Got the holes mostly drilled for the MC today. The hole saw I have has a fixed pilot bit for wood. I tried using another bit the same size, but the damned thing walked and I didn't realize it in the tight space under the dash. So I opened it up as large as I could with a step bit and will have to finish it up with a carbide burr, it looks like.

    Sent from my SM-G970U using Tapatalk
    Reply With Quote  
     

  5. #55 Re: Project Hugs Version 4.0 
    Member
    Join Date
    Feb 2016
    Location
    E-town PA
    Posts
    181
    Rep Power
    16
    Got the clutch master center hole opened up to the final size today. Test fit the master and the reinforcement plate and all is well. Looks like the pedal cluster has gone in for the final time. I'll make a plate that goes behind the clutch MC mounting and covers the pre-punched holes in the early body. I think I can remove the mounting plate from the TCM and use it to help secure the new block off plate. I'll use some bulk gasket material I have around to help seal it all.

    Nest steps include cutting the plate for the shifter, grabbing the pilot bearing and CPS, and getting the flywheel surfaced so I can install the trans. I'm anticipating a shifter modification to keep it out of the dash, but until the trans is in I can't be sure.

    Sent from my SM-G970U using Tapatalk
    Reply With Quote  
     

Page 3 of 3 FirstFirst 123
Thread Information
Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Posting Permissions
  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •